Moratelindo International Cable System-1 (MIC-1) is a significant submarine cable system designed to enhance connectivity across various regions. This state-of-the-art cable system plays a crucial role in meeting the growing demand for high-capacity internet services and improving data transmission quality.
Ready for Service Date: MIC-1 was officially ready for service as of March 2021, marking a significant milestone in the development of international telecommunications infrastructure.
Cable Landing Stations: MIC-1 features multiple cable landing stations strategically located to optimize its operational efficiency and connectivity. The primary landing stations for the cable include:
These locations were selected to facilitate robust interconnectivity between Southeast Asia and other global networks, ensuring seamless data flow and improved latency for end-users.
Total Capacity: The total capacity of the Moratelindo International Cable System-1 is designed to accommodate a substantial amount of data traffic, with an initial capacity of 16 Tbps (terabits per second). This high bandwidth capability enables the cable to support a wide range of services, including internet connectivity, data center interconnections, and various telecommunication applications.
Lifespan of the Cable: The expected lifespan of the MIC-1 submarine cable is approximately 25 years. This longevity ensures that the infrastructure remains relevant and capable of adapting to the evolving demands of global telecommunications.
Consortium Members: The consortium responsible for the development and operation of the Moratelindo International Cable System-1 consists of the following members:
These consortium members bring together their expertise and resources to ensure the successful deployment and operation of the MIC-1, collectively enhancing the digital landscape across the regions served by this submarine cable system.