Geo-Eirgrid Submarine Cable
The Geo-Eirgrid submarine cable project is a significant infrastructure initiative aimed at enhancing connectivity between Ireland and Great Britain. This strategic cable will play a crucial role in the region's energy landscape, facilitating the transfer of electricity and supporting the growth of renewable energy sources.
Ready for Service Date:
The Geo-Eirgrid submarine cable is expected to be ready for service in 2024. This timeline reflects the project's commitment to meeting the increasing demand for energy interconnectivity in the region.
Cable Landing Stations:
The cable will feature multiple landing stations strategically located to optimize energy distribution. Key landing stations for the Geo-Eirgrid submarine cable include:
Total Capacity:
The total capacity of the Geo-Eirgrid submarine cable is designed to support a robust energy flow, with a planned capacity of 1,000 MW. This capacity is critical for facilitating the exchange of renewable energy between the two regions and enhancing grid reliability.
Lifespan of the Cable:
The Geo-Eirgrid submarine cable is engineered with longevity in mind, boasting a lifespan of approximately 25 years. This durability ensures that the infrastructure will serve the regions' energy needs well into the future, adapting to changing demands and technology.
Consortium Members:
The consortium members responsible for the Geo-Eirgrid submarine cable project include: