The Firmina submarine cable is a vital infrastructure project designed to enhance global connectivity, particularly between North America and South America. This cable system is notable for its significant capacity and advanced technology, which aims to support the growing demand for internet bandwidth in the region.
Ready for Service Date:
The Firmina submarine cable was officially ready for service in September 2022.
Cable Landing Stations:
The cable has several landing stations strategically located to maximize its operational reach. These include landing points in the following locations:
Total Capacity:
The Firmina cable boasts a total capacity of 12 terabits per second (Tbps), making it one of the highest-capacity submarine cables currently operational. This extensive bandwidth allows for improved internet services, supporting both consumer and enterprise needs.
Lifespan of the Cable:
The projected lifespan of the Firmina submarine cable is approximately 25 years. This long duration reflects the robust engineering and materials used in its construction, ensuring reliability and longevity in service.
Consortium Members:
The Firmina submarine cable is developed and operated by a consortium that includes the following members:
This collaboration signifies a strategic partnership aimed at bolstering digital connectivity and fostering economic growth in the regions served by the cable.