Fiber Optic Gulf (FOG) Submarine Cable is a cutting-edge telecommunications infrastructure designed to enhance connectivity across the Gulf region. This advanced submarine cable system plays a crucial role in meeting the growing demand for data transmission, supporting both consumer and business needs.
Ready for Service Date:
The Fiber Optic Gulf (FOG) submarine cable was officially ready for service on March 1, 2023. This marks a significant milestone in improving regional connectivity and facilitating high-speed internet access.
Cable Landing Stations:
The FOG submarine cable features multiple landing stations strategically located throughout the Gulf region to ensure optimal performance and accessibility. The primary cable landing stations include:
These landing stations serve as vital hubs for connecting various telecommunications networks, allowing for seamless data transmission across borders.
Total Capacity:
The total capacity of the Fiber Optic Gulf (FOG) submarine cable is designed to support a substantial amount of data traffic, with an impressive capacity of 100 terabits per second (Tbps). This high capacity enables the cable to accommodate the increasing demand for bandwidth and support future advancements in technology.
Lifespan of the Cable:
The expected lifespan of the Fiber Optic Gulf (FOG) submarine cable is approximately 25 years. This durability ensures that the cable remains a reliable backbone for regional telecommunications, adapting to the evolving needs of users over time.
Consortium Members:
The Fiber Optic Gulf (FOG) submarine cable project is a collaborative effort among several prominent telecommunications entities in the Gulf region. The consortium members include:
These consortium members bring together their expertise and resources to support the successful deployment and operation of the FOG submarine cable, ensuring enhanced connectivity and robust telecommunications infrastructure for the region.