EllaLink is a state-of-the-art submarine cable system designed to enhance connectivity between Europe and South America. The cable system aims to bridge the digital divide and provide a robust, high-capacity link across the Atlantic Ocean.
Ready for Service Date:
EllaLink was officially ready for service on July 9, 2021. This milestone marked a significant achievement in expanding global telecommunications infrastructure.
Cable Landing Stations:
The EllaLink cable system connects several key landing stations, which are strategically located to facilitate optimal data transfer between the continents. The primary cable landing stations include:
These stations serve as critical nodes for data transmission and ensure low-latency connectivity for users across both regions.
Total Capacity:
EllaLink boasts a total capacity of 72 Tbps (terabits per second). This impressive bandwidth is designed to accommodate the increasing demand for internet services and data traffic, supporting various applications, including cloud computing, streaming services, and enterprise connectivity.
Lifespan of the Cable:
The expected lifespan of the EllaLink submarine cable system is approximately 25 years. This longevity ensures that it can continue to meet the growing needs for high-speed connectivity well into the future, adapting to technological advancements and rising data consumption.
Consortium Members:
The EllaLink submarine cable system is developed and operated by a consortium that includes the following members:
This consortium is dedicated to improving connectivity, enhancing the digital ecosystem, and fostering collaboration between Europe and South America through this advanced infrastructure.