The East Coast Cable System (ECCS) is a significant submarine cable project designed to enhance connectivity and bandwidth capacity between various regions. This cable system is vital in meeting the growing demand for high-speed internet and robust communication infrastructure.
Ready for Service Date:
The East Coast Cable System is set to be ready for service in the first quarter of 2024. This timeline highlights the project's commitment to responding to the increasing needs for data transmission across the East Coast.
Cable Landing Stations:
The ECCS features multiple cable landing stations to facilitate the seamless transfer of data. These landing stations are strategically positioned to ensure optimal network performance and redundancy. The primary landing points include:
(These locations illustrate the intended landing points, with specific geographic details to be confirmed as the project progresses.)
Total Capacity:
The East Coast Cable System boasts a total capacity of 96 Terabits per second (Tbps), making it one of the most advanced submarine cable systems in operation. This substantial capacity is designed to support the burgeoning needs of internet users, businesses, and emerging technologies.
Lifespan of the Cable:
The expected lifespan of the East Coast Cable System is approximately 25 years. This longevity is crucial for ensuring sustained service levels and accommodating future technological advancements.
Consortium Members:
The East Coast Cable System is developed and operated by a consortium including the following members:
These consortium members bring together their expertise and resources, ensuring the successful deployment and management of the submarine cable system.