The DAMAI Cable System is a state-of-the-art submarine cable system designed to enhance connectivity across the Asia-Pacific region. This cable system plays a critical role in meeting the growing demand for high-speed internet and data transmission, supporting various applications from consumer internet to enterprise services.
Ready for Service Date: The DAMAI Cable System was officially ready for service in August 2021, marking a significant milestone in improving digital infrastructure in the areas it connects.
Cable Landing Stations: The DAMAI Cable System features several key cable landing stations that facilitate its operations and connectivity. These stations include locations that are strategically positioned to provide optimal coverage and accessibility to various regions. The specific cable landing stations are as follows:
Total Capacity: The DAMAI Cable System boasts an impressive total capacity of 108 Tbps (Terabits per second), utilizing advanced optical fiber technology. This capacity is designed to accommodate the increasing data traffic demands and enhance broadband services in the regions connected by the cable.
Lifespan of the Cable: The expected lifespan of the DAMAI Cable System is approximately 25 years, ensuring long-term reliability and performance. This duration underscores the commitment to maintaining robust connectivity and supporting future technological advancements over its operational lifetime.
Consortium Members: The DAMAI Cable System is backed by a consortium of reputable members, each contributing expertise and resources to the project. The consortium members include:
The collaboration among these consortium members ensures the effective management and expansion of the DAMAI Cable System, fostering improved communication links and bolstering the digital economy within the region.