Cross Straits Cable Network Submarine Cable Overview
The Cross Straits Cable Network is a submarine telecommunications cable system designed to enhance connectivity between the Chinese mainland and Taiwan. This significant infrastructure project aims to increase bandwidth capacity, reduce latency, and provide reliable communication channels for both regional and international users.
Ready for Service Date
The cable was officially ready for service on June 1, 2020. This marked a critical milestone in improving telecommunications and internet services across the Taiwan Strait.
Cable Landing Stations
The Cross Straits Cable Network consists of several strategic cable landing stations that facilitate the interconnection of the cable to terrestrial networks. The primary landing stations are located at:
These locations were chosen for their geographical advantages and existing infrastructure, ensuring minimal disruption to services and optimal connectivity.
Total Capacity
The total capacity of the Cross Straits Cable Network is approximately 80 terabits per second (Tbps). This substantial bandwidth is designed to accommodate the growing demand for high-speed internet access, cloud services, and content delivery in the region.
Lifespan of the Cable
The expected lifespan of the Cross Straits Cable Network is around 25 years. This durability ensures that the system can support current and future telecommunications needs without requiring significant upgrades or replacements in the near term.
Consortium Members
The Cross Straits Cable Network is developed and maintained by a consortium of leading telecommunications companies, which includes:
These consortium members bring together their expertise and resources to enhance the cable's performance and reliability, ensuring efficient communication services across the Taiwan Strait.