The Amerigo Vespucci submarine cable is a significant infrastructure project designed to enhance global connectivity and improve data transmission speeds between continents. This undersea cable system serves as a critical link in the modern digital economy, allowing for increased bandwidth and reduced latency in communications.
Ready for Service Date:
The Amerigo Vespucci submarine cable was officially ready for service on December 1, 2021. This date marks the completion of the installation and testing phases, enabling users to take full advantage of the cable’s capabilities.
Cable Landing Stations:
The Amerigo Vespucci cable system features multiple landing stations strategically located to optimize connectivity and provide diverse routing options. Key landing stations include:
These landing stations facilitate connections to various networks and allow for seamless integration with existing infrastructure.
Total Capacity:
The Amerigo Vespucci submarine cable boasts a total capacity of 200 terabits per second (Tbps). This impressive capacity is designed to accommodate the growing demand for high-speed internet and data services, supporting a wide range of applications including cloud computing, streaming services, and enterprise connectivity.
Lifespan of the Cable:
The lifespan of the Amerigo Vespucci submarine cable is projected to be approximately 25 years. This longevity is attributed to the advanced technologies used in its construction and the robust materials selected to withstand the challenging underwater environment.
Consortium Members:
The consortium behind the Amerigo Vespucci submarine cable includes the following members:
These consortium members have collaborated to fund, build, and operate the cable system, ensuring that it meets the demands of modern telecommunications while providing reliable service to users.